Experience

Principal Software Engineer

Real-time radar signal processing, embedded C, and the software architecture around them. Every role, project and result below links to the others; each result opens a case study.

Current role

Principal Software Engineer

Raytheon · since Mar 2026

Software Engineer I to Principal Software Engineer in 6.4 years.

Timeline

Roles, work projects and wins on one axis, focused on recent years; earlier years are compressed, not cut. Select any bar or marker to jump to it.

Rows
Focus

Career record

Every role, and what shipped under it.

Grouped by employer, newest first. Responsibilities held alongside a role sit inside it.

Raytheon

Oct 2019 – Present7 yrs4 roles3 promotions

  1. Mar 2026 – Present7 mosPromotionCurrent

    Principal Software Engineer

    • DSP lead
    • Embedded software across radar programs

    Principal engineer and DSP lead for embedded software on radar programs. Set architecture and direction; drove requirements and verification across hardware, firmware, integration, and test.

    • Architecture
    • Leadership
    • Lifecycle

    Work projects Group A, Group E, Group T, Radar receiver replacement

    • Mar 2026 – PresentLeadership

      Set embedded software direction across radar programs

      Arbitrated design decisions between hardware, firmware, integration, and test organizations. Unblocked cross-team conflicts before they reached the program schedule.

      • Embedded C
      • DSP
      • Radar systems
      • Requirements engineering

    Held alongsideDec 2025 – Present10 mosCurrent

    AI Lead
    • Pilot of 20 engineers
    • Rollout to ~1,000 engineers

    Leads AI tool adoption for the program's software and systems engineers. Writes the policy for approved AI use on code deliverables and the guardrails around it, and runs the pilot ahead of a program-wide rollout.

    • Applied AI
    • AI governance
    • Engineering enablement
    • 20 to ~1,000Engineers, pilot to rollout

      Dec 2025 – PresentApplied AI

      Leading AI tool adoption across the program

      A 20-engineer pilot runs under that policy now, ahead of access for about 1,000 software and systems engineers.

      • Generative AI
      • AI policy
      • Engineering enablement
  2. Feb 2025 – Mar 20261 yr 1 moPromotion

    Senior Software Engineering Task Lead

    • Team grown from 8 to 18 engineers

    Software architect and task lead for a new radar receiver. Defined interface contracts across hardware, firmware, and systems; grew the team from 8 to 18 engineers.

    • Architecture
    • Hardware integration
    • Technical leadership

    Work projects Group A, Group E, Group T, Radar receiver replacement

  3. Apr 2022 – Feb 20252 yrs 10 mosPromotion

    Software Engineer II

    Software task manager for several radar signal-processing capabilities, absorbing responsibilities as senior engineers retired or left. Found the race condition that blocked the radar's government acceptance, and delivered an end-of-life DSP replacement solo, 6 months early and 48% under budget, cutting boot failures from 7–10% to 2–3% along the way.

    • DSP
    • Embedded
    • Technical leadership

    Work projects End-of-life DSP replacement, Group A, Group E, Group T

    • 5 to 1DSPs a customer must swap at once

      Jun 2024DSP

      Made radar DSPs plug-and-play so customers can replace them one at a time

      Customers can replace obsolete DSPs one at a time, as boards fail or budget allows, instead of buying and swapping all 5 at once. Operators no longer need to know or enter the hardware configuration at boot. The extra work fit inside the effort's 48%-under-budget delivery.

      • DSP
      • Hardware integration
      • Boot and initialization
      • Auto-configuration
      • Systems design
    • 7–10% to 2–3%Boot failure rate

      Sep 2023Embedded

      Cut boot failure rate from 7–10% to 2–3% on radar platform

      Boot failure rate dropped from ~7–10% to ~2–3%. The failure was a major pain point for the customer, who had filed 93 formal issues against it across two software releases, all rated major. That was about a quarter of the 354 customer issues filed across all of the team's software releases, and this one fix closed all 93. Each boot takes about 10 minutes, and test events run about five a day with 20–30 engineers on site, so every failed boot left the whole team waiting. The fix still ships in every fielded unit worldwide. Remaining failures are due to the supplier's released hardware limitations.

      • Embedded C
      • Boot and initialization
      • Failure analysis
      • Hardware integration
    • 6 months earlyDelivered 48% under budget

      May 2023 – Sep 2024DSP

      Delivered an end-of-life DSP replacement 6 months early and 48% under budget

      Finished 6 months ahead of schedule and 48% under budget across the full software and test effort. Replaced the supplier's DMA boot protocol with a POSIX-compliant Ethernet/UDP boot, which cut reliance on supplier software and made boot about 10% faster and far more consistent. This work also produced the boot-failure fix (7–10% → 2–3%) and plug-and-play DSPs that customers can replace one at a time.

      • DSP
      • Hardware integration
      • Boot and initialization
      • Ethernet/UDP
      • POSIX
      • Supplier coordination
    • OvernightFix after an 8-month, 5-engineer investigation

      Nov 2022Embedded

      Resolved the race condition blocking the radar's government acceptance

      Implemented the root-cause fix overnight and passed customer-site testing the following morning. The fix closed 19 formal customer issues, all rated major, out of 354 filed across all of the team's software releases. Preserved the only software baseline compatible with an obsolescence-driven hardware replacement required for continued radar production.

      • Embedded C
      • Real-time systems
      • Concurrency debugging
      • Failure analysis
      • Hardware integration

    Held alongsideDec 2023 – Present2 yrs 10 mosCurrent

    DevSecOps Champion
    • One of 2 champions
    • ~400 software engineers

    One of two DevSecOps champions, nominated by leadership, for a program software group of nearly 400 engineers. Works with Raytheon's corporate software modernization team and the program's platform engineers to bring modern source control, build infrastructure, and automation to the program.

    • Developer platform
    • Source control migration
    • Build automation
    • Dec 2023 – PresentDevOps

      Leading the program's move from ClearCase to GitLab

      The tooling works in both ClearCase and GitLab, so teams can adopt Git gradually instead of switching all at once. GitLab merge requests replaced separate code review tools, and new engineers need less source control training.

      • GitLab
      • Git
      • ClearCase
      • Migration tooling
    • 30–50%Faster builds

      Dec 2023 – PresentDevOps

      Modernized the program's build infrastructure

      Build times dropped 30–50%, depending on the build hardware. Every migrated team builds through these pipelines, and checks are shared and controlled across groups instead of each team maintaining its own. Code and tools stay in sync between the program's unclassified and classified networks.

      • Containers
      • Jenkins
      • Artifactory
      • GitLab CI
      • Coverity
  4. Oct 2019 – Apr 20222 yrs 6 mos

    Software Engineer I

    Embedded C on DSP hardware for real-time radar signal processing. Built the radar's interface to a simulated missile, tuned real-time paths, and became software task manager for several radar signal-processing capabilities.

    • DSP
    • Embedded
    • Performance

    Work projects Group A, Group E, Group T, Simulated missile interface

    • $2M+ to 1 PCHardware needed to simulate a missile

      Feb 2020 – Aug 2020Embedded

      Replaced $2M+ of missile-simulation hardware with software on a Linux PC

      Simulating a missile used to take more than $2 million of dedicated hardware (2020 cost). The new simulator needs only a Linux computer and an Ethernet connection. With no specialized hardware left to go end-of-life, the simulation is also protected from future obsolescence. Proof of concept and the first successful end-to-end runs came in August 2020, six months after the project started.

      • RTOS
      • Embedded C
      • Interface development
      • Simulation
      • Cross-team debugging
      • System integration
      • Requirements

Work projects at Raytheon

Olympus

Sep 2018 – Dec 20183 mos1 role

  1. Sep 2018 – Dec 20183 mos

    Electrical Engineering Co-op

    Non-destructive testing (NDT) division. Debugged hardware issues at the PCB level, built bills of materials for new products, and automated software tests that traced connectivity performance problems back to the software.

    • Hardware debug
    • Test automation

J&M Brown

Jan 2018 – Apr 20183 mos1 role

  1. Jan 2018 – Apr 20183 mos

    Project Management Co-op

    Project management support at an electrical construction contractor.

Wentworth Institute of Technology

Sep 2015 – Aug 20193 yrs 11 mos1 role

  1. May 2017 – Dec 20181 yr 7 mos

    Research Assistant

    R&D on the school's student-built photolithography system. Took over its dose-control software and measurement circuits, and regularly presented new designs and data to faculty mentors.

    • Embedded
    • Circuit design
    • Verification
    • 15% to 2%Dose error

      May 2017 – Dec 2018Systems

      Cut photolithography dose error from 15% to 2%

      Dose error fell from about 15% to 2%. Presented as posters at AAAS and NCUR 2018.

      • Microcontrollers
      • Circuit design
      • MATLAB
      • Oscilloscopes
      • Photodiode calibration
  2. Sep 2015 – Aug 20193 yrs 11 mos

    B.S. Electrical Engineering

    • Magna Cum Laude
    • GPA 3.83 / 4.0

    Minors in Applied Mathematics and Computer Science.